Here we are setting up for another day of concrete, tomorrow. Things are moving along at a good pace as the weather has been favorable this week. This picture is an image from the other side of the bump featured in the last post
Here is Thomas the excavator driver cutting material out from the perimeter of the skatepark. I can not believe I have not posted a photo of him sooner as he does so much work around the site.
The hole he is digging is for the exterior wall of the skatepark. The building site is quite tight and getting tighter, but we are managing.