Placed To Ride – Skateparks R Us

July 25, 2007

Another day on the site and around town

Filed under: Uncategorized — hauser @ 5:26 pm

img_3357.jpgExcavation work is starting to reveal a big pit and two even larger mountains of material. Form work is continuing and I’ve been around town fixing details. I am glad Avesta is a small town so drive times don’t equal much.

The posted picture shows grey skies, but while I was inside today the sun came out and some actually claimed it to be hot at the construction site this afternoon. The sun seems to make a tremendous difference. When it shows itself the warmth is felt, otherwise this week has been quite mild with a few sprinkles mixed in between. We all hope we will be finished with construction before late Autumn so we can head south before the sun fully does.

1 Comment

  1. Good work,
    This will put some more preassure on the weak poloticians of Stockholm city to build Highvalley skatepark (and if not we just extend the subway to Avesta ;-).

    Comment by Johan Sandström — July 26, 2007 @ 12:24 pm

RSS feed for comments on this post.

Sorry, the comment form is closed at this time.

Powered by WordPress